InsideAir Elevator Drilling
Delancey Street
Client: Elevator Construction & Repair
Limited parking? Steps to a small entry door? Existing undersized hoistway? No problem for United Drilling’s InsideAir. Only blocks from exclusive Rittenhouse Square, on a narrow street, United Drilling brought in all the power and equipment to drill a 38’ hole inside this beautiful residence. The best part, after 3 days onsite, the hole was completed, the dirt all removed from the building, and everything was left as if we were not even there. All of this can be completed because of our unique equipment operated by extraordinary crews.